Transform Your Home with Sustainable Building
Quality Home Construction · Reliable Maintenance · Eco-friendly Solar Solutions
Our Expertise
Comprehensive construction and sustainability solutions tailored to your needs
Why Choose Bwood Ltd?
With over 10 years of experience in construction and building maintenance, we've built our reputation on quality, reliability, and innovation. Our commitment to sustainable practices and cutting-edge solar solutions sets us apart in the industry.
- Fully licensed and insured professionals
- Sustainable and eco-friendly practices
- Comprehensive project management
- 24/7 emergency support available
Trusted & Certified
Accredited by leading industry bodies for your peace of mind
Common Questions
Quick answers on planning and solar in England
Do I need planning permission for a single-storey rear extension?
Often not. Under householder permitted development rights in England, a single-storey rear extension can go up to 3 metres beyond the rear wall of the original house (4 metres for a detached house) and up to 4 metres high, without a planning application.
You can go up to 6 metres (8 metres detached) by applying for prior approval first: the council notifies your neighbours and has 42 days to decide.
Other conditions apply: extensions and outbuildings together can cover no more than half the land around the original house, materials must look similar to the house, and eaves within 2 metres of a boundary can be no higher than 3 metres. Flats and maisonettes do not have these rights, and they are reduced in conservation areas, on listed buildings and where an Article 4 direction applies.
What does "original house" mean in the planning rules?
The house as it was first built, or as it stood on 1 July 1948 if it was built before then. Any extensions added since (by you or previous owners) count towards the permitted development limits.
Do I need planning permission for solar panels on my house?
Usually not. Solar panels on a house in England are normally permitted development if:
- on a pitched roof, they stick out no more than 0.2 metres from the roof slope and are no higher than the highest part of the roof (excluding chimneys);
- on a flat roof, their highest part is no more than 0.6 metres above the highest part of the roof;
- on a wall, they stick out no more than 0.2 metres on a wall next to a road, or 0.4 metres elsewhere.
They must be sited, as far as practicable, to minimise their effect on the look of the building, and removed when no longer needed. They are not permitted development on listed buildings, and wall-mounted panels on a wall facing a road are not allowed in conservation areas. These rules were updated on 27 August 2026, which also added rules for plug-in (balcony) solar and for ground-mounted panels.
Ready to Start Your Project?
Get a free consultation and quote for your construction, maintenance, or solar installation needs.